Iron Sheepdog Market Intelligence

New Jersey | September 2026

New Jersey’s September Iron Index is 79 (Active). Two September 29 contracts total $200.0 million in listed awards, led by Route 1 bridge reconstruction and widening. Regional diesel remains a material cost consideration.

REPORT TYPE
State Report
REPORTING PERIOD
September 2026
PUBLISHED
October 28, 2026
DATA AS OF
September 28, 2026
VERIFIED
October 28, 2026
THE IRON INDEX™

The monthly operating picture

3
verified sources
79
/ 100
Active

One score summarizing project activity, demand, capacity, operating pressure, and near-term opportunity.

THIS MONTH IN 20 SECONDS
↗

Two September 29 contracts total $200.0 million in listed awards.

!

Route 1 bridge reconstruction and widening accounts for $189.6 million.

→

Central Atlantic diesel was $6.531 per gallon in the week of September 28.

MARKET SCORECARD

Where the market stands now

0 weak  •  100 exceptional
Transportation
95
/100
Heavy civil
90
/100
Project pipeline
/100
Broker opportunity
/100
Hauler capacity
69
/100
Fuel risk
25
/100
DEEP DIVE

The full market analysis

For readers who want the detail behind the score, signals, regional outlook, and operating recommendations.

Executive read: New Jersey’s September Iron Index is 79 (Active), Iron Sheepdog’s proprietary assessment. The September 29 cycle is concentrated in a major Route 1 bridge project and Route 94 roadway and culvert work. Confirm actual material packages and mobilization before committing equipment.

Market at a glance

  • Latest completed cycle: September 29, two contracts totaling $200,001,738.40 in listed awards.
  • Largest project: Route 1 Raritan River northbound bridge reconstruction, widening and superstructure replacement, $189,638,738.40.
  • Additional structural work: Route 94, $10,363,000, including four culvert construction sections.
  • Regional diesel: Central Atlantic (PADD 1B), $6.531 per gallon for the week of September 28.

Projects and programs to watch

Route 1 — Raritan River northbound bridge

NJDOT lists contract DP26107 at $189,638,738.40 following the September 29 opening. Bridge reconstruction, widening and superstructure replacement define the work. This is a concentrated construction signal; the full contract value is not a hauling budget or a load forecast.

Route 94 — Pleasant Valley Drive to Maple Grange Road

Contract DP26121 is listed at $10,363,000. Its detailed bid schedule includes culvert construction, roadway work, signals and traffic control. Confirm the sequence of excavation, deliveries and disposal directly with the project team.

Operating environment

Fuel and margins

Central Atlantic diesel was $6.531 per gallon for the week of September 28. This regional benchmark is not a New Jersey pump price. Fuel adjustments, return mileage and waiting time matter when comparing a specific route’s economics.

Capacity signal

New Jersey seasonally adjusted construction employment was 163,000 in September, compared with 166,100 a year earlier, a decline of approximately 1.9%. September employment is preliminary. Hauler Capacity is an employment-based proxy; it does not count available trucks or drivers.

Risk map

  • One large bridge project dominates this cycle; it does not establish broad demand across every local market.
  • Contract awards do not establish immediate hauling releases or mobilization dates.
  • Regional diesel and statewide employment can differ from local operating conditions.
  • Listed project values are not hauling revenue, confirmed loads or equipment requirements.

Report coverage

Four assessed indicators

This edition assesses letting activity, work mix, regional fuel and construction employment. Project Pipeline and Broker Opportunity are not scored because comparable forward-project dollar coverage is unavailable. This inaugural edition has no month-over-month Index trend.

Cycle and timing

Activity uses the latest completed September cycle, September 29, rather than the sum of all September openings. NJDOT’s award records were checked after the letting. Earlier September cycles are used only for historical comparison. Municipal, private and separately procured projects are outside this scope.

What to do next

Broker playbook

  • Focus outreach on the two identified project teams and confirm actual hauling packages.
  • Verify local equipment availability against release dates.
  • Price fuel adjustments and waiting time explicitly.
Explore Broker Intelligence

Contractor playbook

  • Sequence bridge and culvert material movements before booking equipment.
  • Confirm provider availability for each construction phase.
  • Compare quotes with consistent fuel, return-mileage and delay terms.
Explore Contractor Intelligence

Hauler playbook

  • Ask about specific excavation, aggregate and disposal packages.
  • Confirm mobilization, site requirements and payment terms before repositioning.
  • Include regional fuel pressure when pricing individual routes.
Explore Hauler Intelligence

Sources & methodology

Data as of
September 28, 2026
Verified
October 28, 2026

Prepared October 28, 2026. Letting, fuel and employment observations are anchored to September. Baseline window: 3-cycle.

  • NJDOT FY2027 Awarded Projects and FY2027 Bid Openings: listed award amounts joined to actual opening dates, including September 29 contracts DP26107 and DP26121. Detailed bid tabulations support project scope. Retrieved October 28.
  • EIA On-Highway Diesel Prices: Central Atlantic (PADD 1B), week of September 28, 2026; retrieved October 23. Regional benchmark, not a state pump price.
  • BLS State and Area Employment: New Jersey seasonally adjusted construction employment, September 2026 and September 2025; retrieved October 23. September is preliminary.

About the Iron Index

The Iron Index is Iron Sheepdog’s proprietary market assessment, built from public DOT, EIA and BLS data. Its scoring derivation is proprietary and is not published.

Disclosures

Hauler Capacity is an employment-based proxy, not a measurement of truck supply. Scores describe observed conditions and are not forecasts or guarantees. Award values are not hauling revenue or confirmed loads.